New railway tunnel for increased traffic load

New railway tunnel for increased traffic load

The Beskyd tunnel in Western Ukraine is an important link for railway traffic between Ukraine, Hungary and Slovakia. Because of its single track, it significantly restricts the traffic flow of the otherwise two-track route. Now a new tunnel is under construction, for which both the client and the contractor have placed their faith in the concrete know-how and proven products of MC.

New railway tunnel for increased traffic load

Eastern Carpathian Mountains - Ukraine

The Beskyd tunnel in Western Ukraine is an important link for railway traffic between Ukraine, Hungary and Slovakia. However, because of its single track and rather dilapidated state, it significantly restricts the traffic flow of the otherwise two-track route, making it a real bottleneck. Now a new tunnel is under construction, for which both the client and the contractor have placed their faith in the concrete know-how and proven products of MC-Bauchemie.

The Beskyd tunnel in Western Ukraine is an important link for railway traffic between Ukraine, Hungary and Slovakia. However, because of its single track and rather dilapidated state, it significantly restricts the traffic flow of the otherwise two-track route, making it a real bottleneck. Now a new tunnel is under construction, for which both the client and the contractor have placed their faith in the concrete know-how and proven products of MC-Bauchemie.
Passing through the Eastern Carpathian Mountains, the Beskyd railway tunnel has been in operation since 1886. As it is used by around 40 percent of Ukraine’s transit railway traffic, it is a particularly important asset. In order to be able to successfully cope with the significant increase in traffic volumes expected for the future, a parallel tunnel tube has been under construction since 2011 under the auspices of the national railway administrative authority “Ukrzaliznytsya”. With overhead rock extending to heights of up to 180m, it has a specified length of 1,822 m (including portals), a height of 8.5m and a width of 10.5m. It will contain two tracks and allow speeds of up to 70 km/h, almost double the value currently possible in the old tunnel. The two tubes will be connected by three cross-galleries so that the old tunnel can be used as an emergency escape and rescue route.
For the implementation of this project, the building contractor “Interbudmontazh” Construction Association is relying on the technical and process expertise of MC-Bauchemie, which was able to convince the customer with its tailored products, high level of service and the rapidly organised production and supply of the necessary admixtures.

Tunnel vision: The Beskyd tunnel is being driven through the mountain by blasting operations, with MC shotcrete used to shore it up.

Tunnel vision: The Beskyd tunnel is being driven through the mountain by blasting operations, with MC shotcrete used to shore it up.
© MC-Bauchemie 2016

Fast and cost-efficient application

The tunnel is being blasted through the mountain, with the resultant cavity being stabilised with shotcrete. At the suggestion of MC’s concrete technologists, the ready-mix provided as the basic material for the wet spray process has been formulated with the superplasticiser MC-PowerFlow 2695 and the setting accelerator Centrament Rapid 640.
MC-PowerFlow 2695 is based on the latest MC polymer technology and, with economical dosage levels, enables the production of stable, segregation-free concretes of minimal adhesiveness to greatly facilitate and accelerate the placement process. The admixture also promotes the development of high initial strength in the concrete. The added shotcrete accelerator Centrament Rapid 640 is specifically suited to stabilisation applications in tunnel and mining work, scoring big with high initial strength values, low dosage levels and minimal bounce. Because of the possibility of placing layer thicknesses of 15 to 20 cm per pass, it also facilitates rapid tunnel heading progress.
Both products are thus currently serving to promote fast and cost-efficient tunnel stabilisation work ready for the actual lining, for which the admixtures have yet to be specified. The tunnel is scheduled for completion at the end of 2017, by which time it will have absorbed around 82,000 m3 of concrete. Commissioning of the tunnel is expected to take place in the following year.

References
Magazine
MC-Pedia
Contact
News
Cookie settings

We are continuously improving our website and we use cookies for this purpose. For an optimal user experience, we recommend that you accept them. Otherwise, parts of the page will be deactivated in the display in accordance with data protection regulations.

Essential

Essential cookies for the website to work properly.

Always active
Analytics

We collect data in order to analyze user behavior on the site. This data will be evaluated to provide a better user experience and make you find what you need faster and easier.

Marketing

We analyze marketing data, for example if you found our site through a marketing campaign. We provide information about success or abandoned carts to better understand if you are interested in a certain product or not.

Comfort

Services that make using our site easier but that are not technically necessary. This includes Google Maps for easy location information, YouTube for embedded videos but also the use of contact forms, which are protected from Spam Using Google ReCaptcha.