Concrete technology know-how from MC Spain has been sought in Lanzarote and in Colombia.

Admixtures for caissons

Concrete technology know-how from MC Spain has been sought in Lanzarote: MC supplied admixtures for the construction of a series of huge concrete box caissons used in the expansion of Arrecife’s harbour in Lanzarote.
Admixtures for caissons

Lanzarote, Spain

Concrete technology know-how from MC Spain has been sought in Lanzarote: MC supplied admixtures for the construction of a series of huge concrete box caissons used in the expansion of Arrecife’s harbour in Lanzarote.

Harbour extension

The giant concrete caissons for the Los Mármoles harbour in Lanzarote's capital, Arrecife, were constructed during July and August 2016 using the slip-form technique. The concrete was manufactured in two production plants installed outside the harbour. The client – the joint venture  Acciona-Lanzagrava – required a concrete offer-ing  low viscosity, good robustness, easy pumpability, adequate  setting times and, not least, high resistance to sea-water. MC Spain was awarded the task of optimising the concrete formulation in a contract that included the provision of con-sultancy support for the duration of the project.
The company suggested a combination of the PCE superplasticiser MC-PowerFlow 3210 and a concrete plasticiser from the Centrament BV product family especially designed in order to provide the desired blend of properties. MC Spain has extensive experience in the manufacture of caissons and floating docks, having already handled 60 orders of this kind involving 20 port authorities in Spain, corresponding to a market share of more than 50 percent.
Each box caisson is about 66.5 m long, 19.5 m wide and 23.5 m deep – and took just seven days or less to build. In all, a total of 35,000 m³ of concrete was used – a supreme technical and logistical achievement that required a high level of communication and cooperation between all participants and in which secured continuous supplies of concrete were of paramount importance. Following the hardening of the concrete, the huge box structures were towed out onto the water, ballasted and sunk at the exact locations required for extending the harbour dock . Thus land was reclaimed from the sea, with the harbour being extended by 430 metres to increase its handling capacity.

View of the huge box caisson production facility in Los Mármoles harbour.

View of the huge box caisson production facility in Los Mármoles harbour.
© MC-Bauchemie 2016

References
Magazine
MC-Pedia
Contact
News
Cookie settings

We are continuously improving our website and we use cookies for this purpose. For an optimal user experience, we recommend that you accept them. Otherwise, parts of the page will be deactivated in the display in accordance with data protection regulations.

Essential

Essential cookies for the website to work properly.

Always active
Analytics

We collect data in order to analyze user behavior on the site. This data will be evaluated to provide a better user experience and make you find what you need faster and easier.

Marketing

We analyze marketing data, for example if you found our site through a marketing campaign. We provide information about success or abandoned carts to better understand if you are interested in a certain product or not.

Comfort

Services that make using our site easier but that are not technically necessary. This includes Google Maps for easy location information, YouTube for embedded videos but also the use of contact forms, which are protected from Spam Using Google ReCaptcha.